MIG Welding Torch Swan Neck (Hrmb15ak)

Model NO.: HRMB14AK
Trademark: HRBinzel
Origin: Changzhou Jiangsu China
HS Code: 85159000
MIG Welding Torch Swan Neck (Hrmb15ak)
 
MIG Welding Torch Swan Neck (Hrmb15ak)
Item CO2 Swan Neck Compatible for  Binzel MB15AK Torch
Type   Swan Neck for 15ak
Packing 5pcs/bag
Certification ISO9001, CCC, CE, ROHS, TUV
MIG Welding Torch Swan Neck (Hrmb15ak)

Changzhou Huarui Welding & Cutting Co., LTD

Since the establishment in 1985, we have become one of the biggest manufacturers of welding
and cutting equipment and accessories in China by modern manufacturing equipment and special
technology. 
We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare
parts. With Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit
different kinds of foreign equipments.

1.MIG Welding Torch
Binzel,Bernard,Tweco,Esab,Lincoln/Tregaskiss,Panasonic/OTC, MAXI,Kemppi,Fronius,Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab

MIG Welding Torch Swan Neck (Hrmb15ak)
MIG Welding Torch Swan Neck (Hrmb15ak)
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount
you want.For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark
authorization letter.
Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test,
High voltage test,Air/Water flow test, Air/Water seal test.

If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your
confirmation or Trade Assurance Order Payment Link. You will be requested to do the pre-paid full
payment before we go into the production. After we get the payment, we start to process the order.
It usually takes 5-15days if we don't have the  items in stock.

Â